From Design to Dive: Step-By-Step Guide to Pool Installation Process:

From Design to Dive: Step-By-Step Guide to Pool Installation Process:

If you're wondering how long it takes on average to install a custom pool, research shows that it can be anywhere between 45 and 75 days! That information on its own can seem quite broad and vague, so understanding the pool installation process can help in several ways.

Understanding pool installation can direct you through the steps in the process in the correct order. I can also help you track your contractor's work and protect you from unnecessary expenses and expensive mistakes. Learn more about swimming pool installation in this quick guide.

The Design and Approval Phase

First, you have to design a swimming pool that fits on your property. It's not just about whether your property is big enough. Your property must accommodate the pump and pipes, and the swimming pool mustn't cut off any existing plumbing.

Once you have a design you like, you also have to get the permits to build it. Swimming pools must meet specific legal standards to be considered safe in Florida.

Working with a Cape Coral or a Naples pool builder during the design phase can help you get a compliant design. You won't get the permit if your design doesn't fit these criteria.

The Excavation Phase

Once you have an approved set of plans and a willing contractor, your contractor will mark out the correct parts of your property and prepare to dig. The build team has to dig out space to install the pool and all the infrastructure it needs. This tends to be the quickest of the pool construction steps, but the size of the pool or tough ground can make it drag on for longer.

Preparing the Property for the Pool

Even the most basic pools don't exist in isolation. They need water connections, pipes for the pump, electrical connections, and aesthetic upgrades.

Many parts of your backyard pool setup must be built or installed before the pool can go in. Mixing up the steps can lead to having to undo some of the work later. That's why getting professional pool installers is important rather than attempting a DIY pool installation if you want a custom pool.

Finishing the Pool Installation Process

Installing the actual pool can also be quicker than some of the other steps, depending on the type of pool you want. A prefabricated pool simply needs to be plugged into the hole in the ground.

Pouring and molding a gunite or shotcrete pool takes far longer. Bad weather can also compound this, as rain can affect the final product negatively.

Get the Pool You've Always Wanted

A pool can be an amazing upgrade to a home, which makes it desirable to get the pool installation process right the first time. This starts with designing a pool that's legally compliant and works for you and then getting those plans approved.

The physical work starts with excavating space for the pool and the other upgrades that go with it. Sometimes, your property needs these upgrades before the pool can finally be installed.

Because it's a significant undertaking, you only want to trust this process with a Cape Coral pool company devoted to craftsmanship and customer satisfaction like Channelmark Pools. Contact us today to start working with Florida's premier pool installation company.